Postby SP1 » Fri Jan 29, 2021 1:58 pm

I’m getting ready to countersink the verticals that have already been integrated into the front side fuselage. The spar tunnel is pretty tight and I can’t get the countersinking tool into the right spot, even with a low profile right angle drill. How did others do it? Thanks


29EDC8DB-9738-4755-80E2-02530471FADF.jpeg
29EDC8DB-9738-4755-80E2-02530471FADF.jpeg (66.41 KiB) Viewed 4586 times


58D9C4F6-8982-4979-B5EC-BD446FD14ED7.jpeg
58D9C4F6-8982-4979-B5EC-BD446FD14ED7.jpeg (103.92 KiB) Viewed 4586 times
SP1
 
Posts: 120
Joined: Sat Sep 10, 2016 2:04 am

Re: F11 countersinking the verticals (tunnel)

Postby sonex892. » Fri Jan 29, 2021 3:36 pm

Hi SPI. I noticed that the rear vertical angle appears to be have been riveted in place already? Normally that doesn't happen with the A model, till after wing rigging is done.

I would first remove the rear angle by drilling out the rivets, then see if there is enough room to countersink the front angles. If there is still not enough space to countersink, remove the front angle also and do both of them on the bench.
Steve
Sonex 892
Steve
Lazair kit 1981 sold
Sonerai 2LS plansbuilt 2003 sold
Sonex kit 2010
Sonerai 2LS project rotax 912
User avatar
sonex892.
 
Posts: 414
Joined: Tue Oct 27, 2015 12:32 am


Return to Sonex Plans

Who is online

Users browsing this forum: No registered users and 9 guests