by N21X » Sat Nov 21, 2020 7:46 pm
Hi guys, thought I would share my procedure for prepping the canopy. Of course I have learned and adapted this procedure from fellow builders.
Step 1: cut piece of 1/8” paper board plywood to the turtle deck. Cut with jigsaw, screw onto table top, rip 1” piece a stand up vertical as a guide for the canopy bow to follow.
Step 2: I utilized two hole saws (3”-4”) worked well (pictured on the lower right of table).
Step 3 repeated: bend canopy rail as needed to fit in place.
- Attachments
-
-
CFI, CFI—I, MEI, MEI-I, ATP, A&P
US ARMY Veteran
Rv9a - Flying
Rv3a - Flying
Onex #165 (Flush riveted w/AM 13 AEROMOMENTUM 127hp & a 59” 4 blade prop)