I had a discussion yesterday with Sonex about the construction of the fuse spar box. The donated/purchased kit we are currently working on has a fuselage that was partly constructed, included in that construction. My question was what kind of rivet device do you use inside the spar box as it is too tight for anything we currently own. The reply was that the spar box is not built until the wings are mounted, jigged and aligned. We have reviewed the plans and we need some advice. what do we need to remove?

Image

Image

Image
IHN,
Robby Knox
rwknoxjr1959@gmail.com
Hazlehurst, GA
KAZE-Hangar 18
912-429-5761
N418XS Reserved
N418SX
 
Posts: 89
Joined: Tue Oct 16, 2018 1:46 pm
Location: Hazlehurst, GA

Re: Discussion with Sonex about Spar Box Construction

Postby Area 51% » Tue Feb 04, 2020 2:18 pm

If it's a Legacy you're working on, go to page F-12. The aft verticals and everything that attaches them, that shouldn't be riveted till wing rigging, have an X through the holes.

The F16-03 tunnel web needs to be removable as well. As soon as you decide on your gear configuration, you can rivet the attachments to that web. Everything except the verticals that is. The print has you holding off till the last minute in case you change your mind about the gear, I guess.
Last edited by Area 51% on Tue Feb 04, 2020 7:01 pm, edited 1 time in total.
Area 51%
 
Posts: 804
Joined: Thu Feb 18, 2016 7:57 am

Re: Discussion with Sonex about Spar Box Construction

Postby N418SX » Tue Feb 04, 2020 6:04 pm

Gear is conventional.
IHN,
Robby Knox
rwknoxjr1959@gmail.com
Hazlehurst, GA
KAZE-Hangar 18
912-429-5761
N418XS Reserved
N418SX
 
Posts: 89
Joined: Tue Oct 16, 2018 1:46 pm
Location: Hazlehurst, GA

Re: Discussion with Sonex about Spar Box Construction

Postby Area 51% » Tue Feb 04, 2020 6:55 pm

Then you can go to page F01 view A-A and ignore the left-hand side of that view. View B gives the rivet pattern for the standard gear. The support angle across the top and the small vertical angles (that support the control sticks) can then be riveted in place keeping in mind the outer holes don't get rivets till wing rigging.

Make sure ALL the holes have been prepped before riveting anything together!! It doesn't look like your support angle and vertical angles have been properly drilled yet.
Area 51%
 
Posts: 804
Joined: Thu Feb 18, 2016 7:57 am

Re: Discussion with Sonex about Spar Box Construction

Postby sonex892. » Wed Feb 05, 2020 3:31 am

I used a hand rivet squeezer inside the tunnel. I do remember the bottom couple of rivets were the most difficult. I probably used a wedge with a hole to squeeze them.

Here is is a photo taken during rigging. You can see what parts of the tunnel need to not be there before up drilling the front 2 holes. The floor not being there at this stage is optional.

Image
Steve
Lazair kit 1981 sold
Sonerai 2LS plansbuilt 2003 sold
Sonex kit 2010
Sonerai 2LS project rotax 912
User avatar
sonex892.
 
Posts: 414
Joined: Tue Oct 27, 2015 12:32 am

Re: Discussion with Sonex about Spar Box Construction

Postby N418SX » Mon Feb 10, 2020 11:34 am

So this is what I have come up with so far that required removal. Comments welcome.

Image

Image
IHN,
Robby Knox
rwknoxjr1959@gmail.com
Hazlehurst, GA
KAZE-Hangar 18
912-429-5761
N418XS Reserved
N418SX
 
Posts: 89
Joined: Tue Oct 16, 2018 1:46 pm
Location: Hazlehurst, GA

Re: Discussion with Sonex about Spar Box Construction

Postby Area 51% » Mon Feb 10, 2020 11:45 am

If those aft verticals are already riveted to the fuselage, they will have to come out.
Area 51%
 
Posts: 804
Joined: Thu Feb 18, 2016 7:57 am

Re: Discussion with Sonex about Spar Box Construction

Postby N418SX » Thu Feb 13, 2020 11:49 am

Area 51% wrote:If those aft verticals are already riveted to the fuselage, they will have to come out.


Rear only, correct?
IHN,
Robby Knox
rwknoxjr1959@gmail.com
Hazlehurst, GA
KAZE-Hangar 18
912-429-5761
N418XS Reserved
N418SX
 
Posts: 89
Joined: Tue Oct 16, 2018 1:46 pm
Location: Hazlehurst, GA

Re: Discussion with Sonex about Spar Box Construction

Postby Area 51% » Thu Feb 13, 2020 12:43 pm

Correct. To be clear...we are talking about a "Legacy" model....right?

It's my understanding the Bs are the opposite.
Area 51%
 
Posts: 804
Joined: Thu Feb 18, 2016 7:57 am

Re: Discussion with Sonex about Spar Box Construction

Postby N418SX » Fri Feb 14, 2020 12:41 am

Correct. It is a legacy.
IHN,
Robby Knox
rwknoxjr1959@gmail.com
Hazlehurst, GA
KAZE-Hangar 18
912-429-5761
N418XS Reserved
N418SX
 
Posts: 89
Joined: Tue Oct 16, 2018 1:46 pm
Location: Hazlehurst, GA


Return to General Discussion

Who is online

Users browsing this forum: Google Adsense [Bot] and 91 guests