Hi guys,
I'm working on installing my main gear legs and setting the length and alignment.
First, I might be kind of going about this backwards but I'm committed now so I'm going with my method! What I've done so far is install the axle weldments on the end of each leg, and drilled them in place on the drill press. The legs are both bottomed out in the axles. So that end is fixed. Now I have the top ends of the legs installed in the motor mount, so what I have left to do is set the overall length and toe angle by sliding and rotating the legs in the mount before drilling the upper holes through the legs.
There's a revision to the gear leg drawing which I totally forgot about, that has you drill the upper 1/4" hole through the legs, 1/2" from the top. Keeping that in mind, since I skipped that step, I inserted the legs until the existing 1/4" holes in the engine mount lined up with a mark 1/2" down from the top of the legs. This puts the top of the legs flush with the top of the tubes of the engine mount, so that seemed to make sense.
Now I am trying to confirm I have the correct length set, and it appears to be way off! With the forward fuselage level, the bottom edge of the lower longerons is 617mm off the floor, and the center of the axle at the outboard end is 160mm from the floor. So the end of the axle is 457mm, or 18", below the fuselage floor. The plans call for it to be 16-43/64" (424mm)!
I figured if it was a little too long I could push the legs a bit farther into the motor mount, but this is more than 1.25" too long! Every picture I can find looks like the gear legs are either flush at the top, or maybe like 1/4" sticking out. Could I be missing something?