NWade wrote:So all you guys who waited until your DAR inspection: You rigged the wings with all of the F10 & F09 parts (all the bits aft of the spar tunnel) just cleco'ed in place? You can't rivet in the tunnel until you rig the wings, and those F10 & F09 parts all connect to either the spar tunnel or the lower rear horizontal cross-member. They can't really be riveted into a stable configuration without the bottom skin in, right? As strong as a well-cleco'ed bunch of parts seem, I think things can still wiggle into a different alignment when you put weight or torque on a series of cleco'ed parts...
Thanks,
--Noel
NWade wrote: Did you essentially stop fuselage work at F09 and work on the canopy, fuel, electrical, and engine pages; then return to finish off the lower fwd fuse afterwards?
Thanks,
--Noel
NWade wrote:So all you guys who waited until your DAR inspection: You rigged the wings with all of the F10 & F09 parts (all the bits aft of the spar tunnel) just cleco'ed in place? You can't rivet in the tunnel until you rig the wings, and those F10 & F09 parts all connect to either the spar tunnel or the lower rear horizontal cross-member. They can't really be riveted into a stable configuration without the bottom skin in, right? As strong as a well-cleco'ed bunch of parts seem, I think things can still wiggle into a different alignment when you put weight or torque on a series of cleco'ed parts... Did you essentially stop fuselage work at F09 and work on the canopy, fuel, electrical, and engine pages; then return to finish off the lower fwd fuse afterwards?
Thanks,
--Noel
Users browsing this forum: No registered users and 26 guests