Hi All,
I've run into a snag while working on SNX-F09. I'm trying to assemble and mount the F10-02 cap and the F09-02 Attach assembly to the fuselage. What I am finding is that when I layer the parts as shown in the plans (especially View C-C), the F10-02 cap is too far aft and does not line up well on the F15-12 Angle Clips.
Additionally, the F10-02 cap and the channel used on F09-02 came pre-drilled for mating together. However, when I use clecos to mate these two parts and then hang them on the F15-12 angle clips, the bottom of the channel is a good 1/8" above the bottom skin of the fuselage. I've measured the distance from the F15-12 angle to the bottom of the fuselage and its bang-on with the dimension shown in the plans. I ordered my kit a long time ago, when Sonex was just starting to offer matched-hole parts. And the change to a 1/8" x 1/8" angle for the upper cap happened between the time I ordered my plans set and when I ordered the kit. Is it possible a drawing change or dimensional change was made that didn't make it into the Drawing Revs list on the Sonex website? Anyone else have this issue?
I have taken a series of photos and posted them here:
https://flic.kr/s/aHskPzJwFG Thanks a bunch for any ideas or suggestions!
--Noel
Sonex #1339