Onex Build Status and Completion Photos

PostPosted: Sat Jun 04, 2011 4:01 pm
by chris
Post pictures of your onex build status here.

Re: Onex Build Status and Completion Photos

PostPosted: Thu Jun 09, 2011 9:57 pm
by onex28
Received my confirmation letter via email today and it looks like no one ahead of me opted out of an Onex polsition . Glad to see that so many are continuing on with the build. Being #28 gives me a projected delivery date the week of August 29. My delivery will be a pick up however. Looking forward to joining the Sonex builders group, sharing build experiences and joining up at future fly ins.

David

Re: Onex Build Status and Completion Photos

PostPosted: Sat Jun 11, 2011 2:00 am
by seanmb
Received my confirmation email today. Looks like quite a few of the later reservation holders did back out. I jumped from reservation #89 to Plans#0059, moving my expected shipment date up 5 weeks to mid November.
Sean

Re: Onex Build Status and Completion Photos

PostPosted: Tue Jun 14, 2011 9:20 pm
by onex28
You can't start too soon. Today I ordered wing tip strobe mounts as the first item for my Onex. I plan on using the Aveo Powerburst lights.

Re: Onex Build Status and Completion Photos

PostPosted: Wed Aug 10, 2011 4:24 pm
by blue4589cb
working

PostPosted: Fri Aug 12, 2011 10:57 am
by blue4589cb
pages of drawings!

Re: Onex Build Status and Completion Photos

PostPosted: Fri Aug 12, 2011 11:39 am
by Andy Walker
blue4589cb wrote:Horizontal and elevator are done working on the vertical!

Vertical and Rudder done , working on the flaps.

This is a very easy build,especially with the premade parts and match hole construction.

I received my kit exactly two weeks ago today. I and others have found mistakes in the drawings.



Pics or it never happened. ;)

Re: Onex Build Status and Completion Photos

PostPosted: Wed Aug 24, 2011 9:47 am
by onex28
I needed additional storage space in the garage for Onex parts plus other AL I have on hand. This addition allows for 62 sq. ft. of space but is limited to 16 inch height if I wanted to ever open the 3rd stall door. You could do this with an opener present but you height would be reduced.

Image

Uploaded with ImageShack.us

Re: Onex Build Status and Completion Photos

PostPosted: Sat Aug 27, 2011 10:49 am
by Onex11
Here is where I stand 10 days after kit reception. The tail and horizontal stabs are pretty much completed (except for the skins installation) and I have started the ailerons, rudder and elevators. I am still debating which way to go as far as Basic ultralight versus Amateur built, in Canada we have both choices available. If I opt for amateur built, I will need to have the parts inspected before covering. Anyhow, I will have time to decide later.

I have included some pictures to show my progress. Since I am a first time builder, it took me some time to properly install my work area. The drawings are complete but sometimes confusing in terms of referencing the assembly of some detail part (a BOM would help). I am wondering why some tail bented parts were not done as part of the machined angle option? Don't forget to plan for either a vise or other means of bending equipment. I guess that in order to meet the 51%, we have to do some work and it is OK by me. I have 35 hrs invested up to now.

I really appreciate Sonex's response to my questions (thank you Kerry). For my first experience, I am having a ball!

Plans: ONX0021

Onex1.jpg
Onex1.jpg (128.86 KiB) Viewed 38118 times

Onex2.jpg
Onex2.jpg (119.34 KiB) Viewed 38118 times

Onex3.jpg
Onex3.jpg (134.34 KiB) Viewed 38118 times

Re: Onex Build Status and Completion Photos

PostPosted: Sat Aug 27, 2011 11:17 am
by Dan
Great work Rheal and thank you for posting the pictures. For those of us still waiting to hold parts in our hands it is a real treat to see how things go together. Please keep the updates and photos coming.