by dbdevkc » Wed Sep 23, 2015 11:45 am
Plans page: WIX-W14
On Detail “B” (outboard vertical stiffener angle) I have a question regarding the orientation of the rivets:
- AN470-5-6 (4 required)
- Should the shop head be on the rear of the spar (like all the other rivets), or, should be on the front side of the spar to be formed against the angle piece - since that is the thicker material?
[color=#800000]Kevin Conklin
Building Waiex #169