Discussion with Sonex about Spar Box Construction
Posted:
Tue Feb 04, 2020 1:05 pm
by N418SX
Re: Discussion with Sonex about Spar Box Construction
Posted:
Tue Feb 04, 2020 2:18 pm
by Area 51%
If it's a Legacy you're working on, go to page F-12. The aft verticals and everything that attaches them, that shouldn't be riveted till wing rigging, have an X through the holes.
The F16-03 tunnel web needs to be removable as well. As soon as you decide on your gear configuration, you can rivet the attachments to that web. Everything except the verticals that is. The print has you holding off till the last minute in case you change your mind about the gear, I guess.
Re: Discussion with Sonex about Spar Box Construction
Posted:
Tue Feb 04, 2020 6:04 pm
by N418SX
Gear is conventional.
Re: Discussion with Sonex about Spar Box Construction
Posted:
Tue Feb 04, 2020 6:55 pm
by Area 51%
Then you can go to page F01 view A-A and ignore the left-hand side of that view. View B gives the rivet pattern for the standard gear. The support angle across the top and the small vertical angles (that support the control sticks) can then be riveted in place keeping in mind the outer holes don't get rivets till wing rigging.
Make sure ALL the holes have been prepped before riveting anything together!! It doesn't look like your support angle and vertical angles have been properly drilled yet.
Re: Discussion with Sonex about Spar Box Construction
Posted:
Wed Feb 05, 2020 3:31 am
by sonex892.
I used a hand rivet squeezer inside the tunnel. I do remember the bottom couple of rivets were the most difficult. I probably used a wedge with a hole to squeeze them.
Here is is a photo taken during rigging. You can see what parts of the tunnel need to not be there before up drilling the front 2 holes. The floor not being there at this stage is optional.
Re: Discussion with Sonex about Spar Box Construction
Posted:
Mon Feb 10, 2020 11:34 am
by N418SX
So this is what I have come up with so far that required removal. Comments welcome.
Re: Discussion with Sonex about Spar Box Construction
Posted:
Mon Feb 10, 2020 11:45 am
by Area 51%
If those aft verticals are already riveted to the fuselage, they will have to come out.
Re: Discussion with Sonex about Spar Box Construction
Posted:
Thu Feb 13, 2020 11:49 am
by N418SX
Area 51% wrote:If those aft verticals are already riveted to the fuselage, they will have to come out.
Rear only, correct?
Re: Discussion with Sonex about Spar Box Construction
Posted:
Thu Feb 13, 2020 12:43 pm
by Area 51%
Correct. To be clear...we are talking about a "Legacy" model....right?
It's my understanding the Bs are the opposite.
Re: Discussion with Sonex about Spar Box Construction
Posted:
Fri Feb 14, 2020 12:41 am
by N418SX
Correct. It is a legacy.