by dbdevkc » Thu Aug 10, 2017 2:23 pm
Question for anyone who assembled their own spar, and recalls the order of drilling the spar caps.
When initially setting the height of the spar (using the spacer tools, and verifying with 2 squares), do I have the entire stackup of webs, or use only the main web all the way up to the root? Then add the stackup after the caps are drilled?
Or, do I do the initial drilling of the caps with the entire stackup of webs in place and clecoed together?
Thanks.
[color=#800000]Kevin Conklin
Building Waiex #169