Page 1 of 1

Onex 0213

PostPosted: Tue Feb 19, 2019 4:26 pm
by stroudj002
I have order a Onex, expecting delivery March 8. I am prepping my work area. I would like to now what is the best way to arrange the kit components. Any suggestion would be a big help.

Thanks,

Jim Stroud

Ocala, Florida

Re: Onex 0213

PostPosted: Wed Feb 20, 2019 11:06 am
by Onex107
I used the chip board and 2 X 4's from the shipping pallet to build a shelf mounted on my garage wall to hold most all the parts except for the large boxes. For a work bench I went to a local second hand furniture store and bought two office desks. Very heavy, adjustable legs to level, drawers, just the right size. With my drill press between the desks the main spar could be moved across the drill press table very nicely. I used some of the chip board to cover the desks so I could drill without damaging them. A perfect set up in a two car garage for both the fuselage and the wings. The best part is when you are finished you can donate the desks back to the furniture store.