by N555NX » Wed Sep 07, 2011 5:05 pm
Swap out incandescent landing lights for the whelens I got at OSH last year, install wing tips (the screw on), Install ailerons and flaps, rig ailerons and flaps, attach ruddervators and double check rigging, doublecheck all rigging and control safeties, double check wheel bearings, finish interior, weigh, tune engine for first flight, label all switches on panel, construct a POH, get inspected, fly.