Robbie,
That is awesome, like we have our own little club. Chicagoland Sonex builders that riveted the bottom of the box on first. Is Tony with us too?
Ryan,
I have not updrilled the front of the tailcone box. Made sense to me that we updrill when we mate the fuselage halves.
Scott,
Thanks again for speaking up. I am glad I post a lot of pictures as you guys have caught some of my mistakes.
So on the box I just did a control-Z. Then Adam riveted on the top. All is well.
- Box top riveted
- image.jpg (94.75 KiB) Viewed 28405 times
Sadly all my cordless drill batteries are dying. I need to replace them but am too cheap. Had to pull out my dad's old Craftsman with the aluminum body and missing ground plug. Though it sparks like an electric train coming into the station and turns slow, it drilled out all those rivets. I think the slow speed helps.
Matthew and I were building his loft bed this AM and he raised the question of how many drills I have. I have 11! Never thought to count them before.
Edit: forgot to mention that we did accidentally updrill the cross ties where the turtledeck formers go. I communicated poorly with Adam, he was happily boring along with his new friend, Mr. Snake drill, while I was cursing the stainless rivets I was drilling out of the box.