After some more distractions, I finished the longerons, pilot drilled to both sides and clecoed the vertical channels in. Match drilled the rudder stop plates, dug out the splice plates, cleaned them up and hopefully get the bevels and bends done. I always have difficulty making an opposite piece..
Left side longerons in work
Both sides piloted for now
I am beginning to think about space at this point, once the panels are polished and riveted, I will probably stop there and do the forward sides. Reason being that once the aft fuse box and cross tie framing is started, I will be out of table space to build anything else!