Fly a few patterns to finish the day with the electronic ignition sucking down the amps and the alternator not keeping up. Even if I smartly turn off the electronic ignition as I clear the hold short and turn it on again for the next pattern - with most of the pattern being a glide - 3 patterns and the battery is depleted for next flight..... No electricity out in the tie downs.

--

A solution - a solar panel on my tie down box, pitched just enough to let the rain run off and slightly favor the sun. But NOT pitched that it will blow over in our windy tie downs. This is a nominal 100w panel with an open voltage around 28v and under load of an appropriate controller can be set to 24v or 12v for charging.

20200131_143542.jpg
Since testing the panel has been mounted and the connectors secured to the mount.


The solar panel plugs to the controller (weighs 8 oz so it is installed on my battery box).

20200130_155349.jpg


The controller senses battery voltage and when the battery drops in voltage - applies solar panel input to the battery to charge it. When the battery is charged it disconnects the solar panel. And when the battery loses a little charge - it charges it up again. On this controller - excess power is made available on another set of leads to power any load you might apply to it. I'm planning on wiring a circuit to the panel to charge cell phone / iPad for when the master is off and the solar panel is plugged in.

In practice I went with a 100w panel that appears to manage to produce about 50w at 12v (nominal) on even a cloudy day in the tie downs. Sun comes out and it easily delivers 100w lying flat.

There are a range of controllers available, some can be programmed in quite sophisticated ways and include temperature compensation probes. In practice this controller is a bit simpler - you connect it to the battery - if senses which type of battery you have connected and adjusts its charge profile to match and then you apply the solar charger and it delivers available current as needed.

The other thing to watch for is IP rating - which is a weathertightness / waterproofness of the panel/controller and interface/connections. Higher numbers are better.

If you leave the controller installed - without a solar panel attached is does use <0.05amps as it monitors the battery. I think I will just carry along a small 10w panel which weighs less than 1lb for when stopped for any length of time when I fly out.

The second set of SAE connectors below the solar plug in is for a regular battery charger. Battery charge must not be connected to the solar controller.

The Aluminum bar extends the connectors to a flush port in the side of the cowl.

--

Amazon prices:

Panel $92
Controller $18
Low loss 25ft extension cord $30

About 2 hours to put it together.
Graeme JW Smith
User avatar
GraemeSmith
 
Posts: 939
Joined: Sat May 18, 2019 8:58 am
Location: RI

Re: Solar Battery Charging / Maintaining in the Tie-Downs

Postby Rynoth » Tue Feb 11, 2020 3:03 pm

Thanks for posting this... I'm still in Phase 1 with my Aerovee Turbo but with the draw of the post-shutdown cooling system in the back of my mind I've always been wondering how I can keep the battery topped off on cross countries. A small lightweight solar panel plugged into my hot 12V socket just might be the ticket.
Ryan Roth
N197RR - Waiex #197 (Turbo Aerovee Taildragger)
Knoxville, TN (Hangar at KRKW)
My project blog: http://www.rynoth.com/wordpress/waiex/
Time-lapse video of my build: https://www.youtube.com/watch?v=Q8QTd2HoyAM
User avatar
Rynoth
 
Posts: 1308
Joined: Fri Jul 26, 2013 1:32 pm
Location: Knoxville, TN

Re: Solar Battery Charging / Maintaining in the Tie-Downs

Postby lakespookie » Tue Feb 11, 2020 5:18 pm

Whats the total weight of the system? call me crazy but the experimental part of my brain says it should not be to hard to install this in the airframe if the weight is reasonable using a flexible panel.
Saturday's Building Live Stream
Jill's Build Log
PPL-ASEL
Tail = Complete
Wings Closed Out = 02/04/2024

Waiex-B 0054
Panel G3X
Engine Spyder 120 corvair conversion
User avatar
lakespookie
 
Posts: 249
Joined: Wed Aug 07, 2019 2:39 pm
Location: San Diego California

Re: Solar Battery Charging / Maintaining in the Tie-Downs

Postby Matt541 » Tue Feb 11, 2020 5:46 pm

Wow! Thanks for posting this Graeme.

Not bad price wise either, and with the cost of solar continuing to decrease, it'll get better. Now if only other aviation aspects would too.
Sonex 541, TD, Center Stick, Revmaster w/ Prince P <SOLD>
:arrow: Anxiously awaiting the new Highwing
User avatar
Matt541
 
Posts: 195
Joined: Mon Jan 13, 2020 3:29 pm
Location: Eastern PA

Re: Solar Battery Charging / Maintaining in the Tie-Downs

Postby GraemeSmith » Tue Feb 11, 2020 8:21 pm

lakespookie wrote:Whats the total weight of the system? call me crazy but the experimental part of my brain says it should not be to hard to install this in the airframe if the weight is reasonable using a flexible panel.

Way ahead of you there! I'm running numbers on some different panel types that might suit and will report.
Graeme JW Smith
User avatar
GraemeSmith
 
Posts: 939
Joined: Sat May 18, 2019 8:58 am
Location: RI

Re: Solar Battery Charging / Maintaining in the Tie-Downs

Postby GraemeSmith » Wed Feb 12, 2020 10:17 pm

Just to follow up.

12 days in the tie downs with no flying. Mainly stormy gray weather. When plane was put away - battery voltage was 12.2v. Today - went to start it - 13.4v. Engine spun up like a top! I'll take that as a win!

Here is the tidied up flight box:

20200212_150236.jpg
Graeme JW Smith
User avatar
GraemeSmith
 
Posts: 939
Joined: Sat May 18, 2019 8:58 am
Location: RI

Re: Solar Battery Charging / Maintaining in the Tie-Downs

Postby Bryan Cotton » Wed Feb 12, 2020 10:42 pm

Cool. Now you just need to add the windmill attachment and all the bases will be covered.
Bryan Cotton
Poplar Grove, IL C77
Waiex 191 N191YX
Taildragger, Aerovee, acro ailerons
dual sticks with sport trainer controls
Prebuilt spars and machined angle kit
Year 2 flying and approaching 200 hours December 23
User avatar
Bryan Cotton
 
Posts: 5063
Joined: Mon Jul 01, 2013 9:54 pm
Location: C77

Re: Solar Battery Charging / Maintaining in the Tie-Downs

Postby jrs » Thu Feb 13, 2020 12:08 pm

I have a battery powered trolling motor that I leave in the water where there is no electric source. Bought a 10 watt charger from Amazon and put it on a post. Simply hook it to the battery when I dock the boat. I believe that it was 28" x 14" and it has the regulator built in. Has been working great for a couple of years. They make 5, 10, 15 watt versions and the 10 will keep the battery charged even if I am using it a few hours a day.

https://www.amazon.com/gp/product/B004Q ... UTF8&psc=1
jrs
 
Posts: 53
Joined: Sun Dec 09, 2018 9:45 pm


Return to Electrical System

Who is online

Users browsing this forum: No registered users and 6 guests