Onex Build Status and Completion Photos

Discussion for builders, pilots, owners, and those interested in building or owning a Onex.

Re: Onex Build Status and Completion Photos

Postby Onex11 » Thu Sep 22, 2011 10:24 pm

21 sep 11 002.JPG
21 sep 11 002.JPG (124.17 KiB) Viewed 21484 times
Hi Marc,

I meant the folder wing rib. Look at the picture. The micro stop countersink tool does a real good job. I am impressed with it.

Rheal
Rheal
ONEX plans 0021
Onex11
 
Posts: 34
Joined: Thu Jun 02, 2011 10:01 pm
Location: Saint-Hyacinthe, Quebec, Canada

Re: Onex Build Status and Completion Photos

Postby onex28 » Sat Sep 24, 2011 5:50 am

Rheal, did you use an arbor press to bend your stab spars and verrtical stab spar fitting. If so what size press and if not how did you bend them.

David
onex28
 
Posts: 219
Joined: Thu Jun 09, 2011 9:43 pm
Location: MN

Re: Onex Build Status and Completion Photos

Postby Onex11 » Sun Sep 25, 2011 9:10 am

Hi David,

For the stab, I have used Jeff Shultz Sonex 604 technique and I don't recommend that because the wood dowel is not strong enough (unless you use steel pipe). I then purchase a 12ton press that was on special at a local tool store ($149). A harbor press is more expensive and a 6ton table top one is probably OK but they were B/O at Harbor Freight. With the right tool the workmanship is quite better and done much faster and accurately. You will still need a 1 in. steel rod like the one on the picture that I had available from my scrap material.

Good luck.
Attachments
sep 2011 007.JPG
sep 2011 007.JPG (125.56 KiB) Viewed 21443 times
Rheal
ONEX plans 0021
Onex11
 
Posts: 34
Joined: Thu Jun 02, 2011 10:01 pm
Location: Saint-Hyacinthe, Quebec, Canada

Re: Onex Build Status and Completion Photos

Postby Onex11 » Fri Sep 30, 2011 5:16 am

ONEX0021 Bird eyes view status after 150 hours (see picture);

Rudder 100% completed
Ailerons 80% counterweights were B/O
Flaps 80%
Elevator 95%
H stab 90% skin installation left
V stab 90% skin installation left
Fuselage tail box 100%
FWD box 25% waiting for more drawings
Inboard wings 10%
Outboard wings 30%


Obviously all these remains to be assembled together and rigged. Based on this experience, I assume that 500 hours or less to assemble and complete a Onex is possible. Skins completion will take a lot of time (dimpling, riveting, etc). As usual, the details will take more time.

I have just ordered my Aerovee and the delivery date is estimated to be (guess what) 22 December 2011. Conway will be my Santa this year!

Here is a hint for the tail box construction (see picture); refer to DWG ONX-F17. ONX-F22-06 bottom tail bracket installation is shown but not the upper one(pic). In order to be able to slip this bracket in there, the only way is to install before completing the tail riveting or omit to install the last 4 RH upper tail side skin rivets so the bracket can be inserted through the skin hole and sideway twisted in place. I chosed to fit it in place before using the V stab assy.

Happy building.
Attachments
26 sep 2011 009.JPG
Upper tail bracket in place before tail complete riveting
26 sep 2011 009.JPG (43.24 KiB) Viewed 21407 times
29 sep 2011 003.JPG
Bird eye view
29 sep 2011 003.JPG (122.44 KiB) Viewed 21407 times
29 sep 2011 008.JPG
Main spar, Inboard and Outboard wing parts
29 sep 2011 008.JPG (124.92 KiB) Viewed 21407 times
Rheal
ONEX plans 0021
Onex11
 
Posts: 34
Joined: Thu Jun 02, 2011 10:01 pm
Location: Saint-Hyacinthe, Quebec, Canada

Re: Onex Build Status and Completion Photos

Postby MichaelFarley56 » Fri Sep 30, 2011 9:46 am

Wow...your progress is amazing! I can't believe you've only been working 150 hours thus far. I'd have to check but I think at 150 hours I had finished my tail feathers and maybe main wing spars.

Keep up the good work! And also, don't be surprised if Sonex calls earlier than December for your engine. When I ordered mine I was first told 6-8 weeks but I think it ended up half that.

Keep the pictures coming!
Mike Farley
Waiex #0056 - N569KM
Jabiru 3300A #1706
MGL Panel
MichaelFarley56
 
Posts: 1473
Joined: Thu Jun 02, 2011 11:38 pm
Location: Columbus, Ohio

Re: Onex Build Status and Completion Photos

Postby Onex11 » Fri Sep 30, 2011 12:48 pm

Hi Michael,

Please note that I had ordered all options, it helps a lot especially the spars option.

Thank you for letting me know about the Aerovee, I will plan accordingly.
Rheal
ONEX plans 0021
Onex11
 
Posts: 34
Joined: Thu Jun 02, 2011 10:01 pm
Location: Saint-Hyacinthe, Quebec, Canada

Re: Onex Build Status and Completion Photos

Postby GOIX » Sat Oct 01, 2011 9:20 am

Hi Rheal,

You sure are smoking along ! Did you close up the rudder and other control surfaces ? Do they need the "pre cover" inspection ?
Thanks for the tip about the bracket . It will be a while before I'm that far !

Marc
Marc
Onex 0024
C-GOIX reserved
GOIX
 
Posts: 39
Joined: Wed Jun 22, 2011 9:08 am
Location: Dundas, Ontario, Canada .

Re: Onex Build Status and Completion Photos

Postby Onex11 » Sat Oct 01, 2011 5:09 pm

Hi Marc,

The rudder is completed, I hope the inspector won't ask me to see inside. In any case, there is nothing but a rib inside. I am not decided yet on either Amateur build or Basic UL category. Therefore, the skins are not installed yet. If A-B is chosen then the inspector will require to see all structures uncovered. The MD-RA cost is estimated at $1,500 but the A/C value is may be higher for resale afterward. I am debating if it is worthed the expense... as I will be flying daytime and VFR only for fun.
Rheal
ONEX plans 0021
Onex11
 
Posts: 34
Joined: Thu Jun 02, 2011 10:01 pm
Location: Saint-Hyacinthe, Quebec, Canada

Re: Onex Build Status and Completion Photos

Postby Onex11 » Wed Oct 19, 2011 1:01 pm

ONEX0021 Bird eyes view status after 200 hours (see pictures);

Rudder 100% completed
Ailerons 80% counterweights were B/O
Flaps 80%
Elevator 95%
H stab 90% skin installation left
V stab 90% skin installation left
Fuselage tail cone 100%
FWD box 100% waiting for more drawings to install to tail cone
Inboard wings 10%
Outboard wings 80% skin installation left
19 015small.jpg
19 015small.jpg (123.33 KiB) Viewed 21283 times

19 014small.jpg
19 014small.jpg (123.29 KiB) Viewed 21283 times

19 012small.jpg
19 012small.jpg (125.59 KiB) Viewed 21283 times
Rheal
ONEX plans 0021
Onex11
 
Posts: 34
Joined: Thu Jun 02, 2011 10:01 pm
Location: Saint-Hyacinthe, Quebec, Canada

Re: Onex Build Status and Completion Photos

Postby Mike53 » Wed Oct 19, 2011 1:29 pm

Rheal of all the options which do you say is the most bang for your dollar.I was thinking I would get the wing and fuse options and skip the spar,but you seem to imply that the spar was maybe the best choice,or maybe I misunderstood?Your progress is phenominal :o
Mike
Mike
I know but one freedom, and that is the freedom of the mind.
Antoine de Saint-Exupery
Reserved C-FONX for the 80th Onex,Hummel 85HP ,Tri gear,GRT Mini X EFIS,and EMS,iFly 740 GPS
User avatar
Mike53
 
Posts: 480
Joined: Mon Jun 20, 2011 10:00 pm
Location: Dutton,Ontario , Canada

PreviousNext

Return to Onex

Who is online

Users browsing this forum: No registered users and 3 guests