Tunnel assembly help needed please...

Discussion for Sonex builders on specific plans page experience. These posts are limited to technical suggestions such as assembly order, challenges, or techniques related to specific plans pages.

Tunnel assembly help needed please...

Postby Sonex1542 » Tue Dec 09, 2014 11:53 am

Hi,
I'm a bit confused as to assembling the rear tunnel Z. Mainly the top of it, and getting the seat in. Per SNX-F11 the 3 outer rivets will be solid rivets, correct? Also I will need to countersink them from the inside of the tunnel? If that's the case, how am I going to pound them in? I just don't see how that's going to work. There is nothing to hold a bucking bar against the bottom for leverage. Will I have to suspend the fuse on a bar of some sort and use that as the weight?

Also, I'm trying to get the seat in. I see that the front line of rivets holding down the piano hinge are just standard rivets, not countersunk, is this also correct?

Lastly, my understanding is that the rear Z is not riveted at this point, that's apparently so incase I need to make the ever so slightest adjustment when mounting the wings, is this also correct? And is that rear top line of rivets on the rear Z countersunk? I didn't see that as being the case. So, other that the 6 rivets, that I have no idea how to buck in place, that line of rivets in between are just pulled from the top at some point? Being when?

I don't see how I can mount the seat without any support from the rear Z, looks lie it may bow the front if I sit in it to mount the tank before everything is buttoned up.

Scratch building, if it makes any difference in the process.
Thanks
Alex-
SNX-794. Formerly SNX-1542
Sonex1542
 
Posts: 53
Joined: Wed Sep 21, 2011 12:09 am
Location: Reno, NV

Re: Tunnel assembly help needed please...

Postby Bryan Cotton » Tue Dec 09, 2014 1:25 pm

Alex,
There are a bunch of folks who are further along than I, so they may be able to answer your questions more completely and better. But, I am just a little behind you.

So on the 3 flush solid rivets per side, I see two ways to do this. The flush part is inside the tunnel. The plans seem to suggest smashing the rivet into the countersink, which will work. On the C140 I was restoring there are a bunch of double flush rivets in the doorpost where the strut attaches. One side started out as flush and the other side filled up the other counterbore. After I had to shave, sand, or file it all the way flush. What I will probably do is back rivet those. Flush head goes underneath, held up by a heavy bucking bar, and the rivet gun forms the shop head directly. I have a special back rivet set though that is not required. It is a two man job.
Bryan Cotton
Poplar Grove, IL C77
Waiex 191 N191YX
Taildragger, Aerovee, acro ailerons
dual sticks with sport trainer controls
Prebuilt spars and machined angle kit
Year 2 flying and approaching 200 hours December 23
User avatar
Bryan Cotton
 
Posts: 5035
Joined: Mon Jul 01, 2013 9:54 pm
Location: C77

Re: Tunnel assembly help needed please...

Postby Rynoth » Tue Dec 09, 2014 1:56 pm

As for the seat, I was able to sit in my seat pan with the aft tunnel Z clecoed in place to support some of the weight. Most of your weight appears to be actually supported by the lower aft cabin (I forget the name of the crossbeam).

The aft tunnel Z is riveted on final fuselage box assembly, after wing rigging is complete. The 6 flush rivets are intended to have the rounded head on the top and the shop head squished into the countersink. I asked Sonex if there were alternatives to this and this is their response:

"We have no substitute for them. They are used there to get the required flush fit in the spar tunnel, to prevent interference with the spars, and we want the round head in the cockpit to prevent a sharp rivet tail from cutting the occupants."
Ryan Roth
N197RR - Waiex #197 (Turbo Aerovee Taildragger)
Knoxville, TN (Hangar at KRKW)
My project blog: http://www.rynoth.com/wordpress/waiex/
Time-lapse video of my build: https://www.youtube.com/watch?v=Q8QTd2HoyAM
User avatar
Rynoth
 
Posts: 1308
Joined: Fri Jul 26, 2013 1:32 pm
Location: Knoxville, TN

Re: Tunnel assembly help needed please...

Postby gammaxy » Tue Dec 09, 2014 3:04 pm

I used the rivets called out in the plans. My wife held the bucking bar on the dome head of each rivet and I pounded the tail into the countersink from underneath (before I riveted the bottom fuselage skin) using the bolt method Sonex recommends for the spars. After procrastinating this task for months, it was done in 10 minutes.
Chris Madsen
Aerovee Sonex N256CM
Flying since September 2014
Build log: http://chrismadsen.org
gammaxy
 
Posts: 593
Joined: Wed Sep 04, 2013 9:31 am

Re: Tunnel assembly help needed please...

Postby sonex892 » Tue Dec 09, 2014 4:29 pm

Sonex1542 wrote:Also, I'm trying to get the seat in. I see that the front line of rivets holding down the piano hinge are just standard rivets, not countersunk, is this also correct?

Hi Alex
Yes just standard rivets as per plans. There are no interference issues with the spars and those seat rivets

Sonex1542 wrote:Lastly, my understanding is that the rear Z is not riveted at this point, that's apparently so incase I need to make the ever so slightest adjustment when mounting the wings, is this also correct?

It's not for slight adjustment. Prior to rigging the wings will need to have the rear tunnel zee and associated parts completed. Do not rivet these parts until rigging is completed. You need to be able to remove all parts associated with the rear tunnel zee, for the initial step in final drilling of the main spar attach blocks to the fuselage attach angles.
Sonex1542 wrote:I don't see how I can mount the seat without any support from the rear Z, looks lie it may bow the front if I sit in it to mount the tank before everything is buttoned up.

Scratch building, if it makes any difference in the process.

Try to resist the temptation to sit in it. Scratch or kit, it makes no difference

Steve
Sonex 892
sonex892
 
Posts: 169
Joined: Fri Jun 03, 2011 4:49 am
Location: Port Macquarie Australia

Re: Tunnel assembly help needed please...

Postby tonyr » Tue Dec 09, 2014 5:35 pm

Hi Alex,

Just to chuck in another twist, I raised the hinge fixed the tunnel Z using a .040" spacer. This is because the front row of seat hinge rivet tails drag on the spar tunnel.

Also I used countersunk solid rivets at the ends of the spar tunnel, inserted from below. Just rounded off the shop end after they were set. From memory the seat pan covers 2 of the three rivet tails.. cuts from tiny rivet tails would be the least of my worries..

The seat pan will bend when you sit in it. I was vary careful with measurements when making it but still had a slight bow with no weight on it.

The danger of sitting in the seat is that you will spend more time dreaming and making airplane noises than building..

Cheers
Tony
Sonex #813
First Flight... 4 Oct 14
298 hours having fun!
http://sonexaus.wikispaces.com/Tony+%28Richo%29+Richardson+Sonex+813
User avatar
tonyr
 
Posts: 200
Joined: Thu Jun 27, 2013 12:50 am

Re: Tunnel assembly help needed please...

Postby Sonex1542 » Tue Dec 09, 2014 8:49 pm

I waited to read the replies to make sure that front row of rivets is what I saw in the plans. But dropping the seat in NOW! I'll keep in mind that they can drag on the wing member, but honestly, will deal with it if it happens on rigging.

Back to the 3 rivets on each side... Am I right in thinking (I did rivet the bottom in) they are gonna be a bitch to get a bucking bar on them? And since Sonex wants them countersunk from the inside, I'll have to deal with them like the rest of the countersunk pulled rivets... Dimple the sheet, and countersink the top aluminum angle?

I imagine I'll have to use some type of metal stand through that tunnel to put enough weight on the bar as I smash for the top!

Thanks all!
SNX-794. Formerly SNX-1542
Sonex1542
 
Posts: 53
Joined: Wed Sep 21, 2011 12:09 am
Location: Reno, NV

Tunnel assembly help needed please...

Postby Sonex1517 » Tue Dec 09, 2014 9:29 pm

No. Riveting those 6 rivets in flush took my friend Tony and I like 15 minutes. (Ok. Mostly Tony. I watched).

It is not as difficult as you think.

Robbie Culver
Sonex 1517
Chicagoland
Tails and Wings complete - finishing fuselage.
N1517S reserved
Robbie Culver
Sonex 1517
Aero Estates (T25)
First flight 10/10/2015
325+ hours
Jabiru 3300 Gen 4
Prince P Tip
Taildragger
N1517S
User avatar
Sonex1517
 
Posts: 1651
Joined: Fri Jun 03, 2011 10:11 am
Location: Chicagoland

Re: Tunnel assembly help needed please...

Postby Rynoth » Tue Dec 09, 2014 9:50 pm

Also those rivets are a size smaller than the wing spar rivets, should be much easier to drive.
Ryan Roth
N197RR - Waiex #197 (Turbo Aerovee Taildragger)
Knoxville, TN (Hangar at KRKW)
My project blog: http://www.rynoth.com/wordpress/waiex/
Time-lapse video of my build: https://www.youtube.com/watch?v=Q8QTd2HoyAM
User avatar
Rynoth
 
Posts: 1308
Joined: Fri Jul 26, 2013 1:32 pm
Location: Knoxville, TN

Re: Tunnel assembly help needed please...

Postby Direct C51 » Sat Jul 23, 2016 8:37 pm

I am having difficulty figuring out how to rivet the 3 end rivets on top of the spar tunnel as well. The bottom skin is already installed so I cannot use a bolt or anything else on the shop head from the bottom. I did already countersink the angle, and notice that a CCP-42 looks like it will have proper grip length. A CCP-42 has a grip length of .062 - .125. The particular part is a .125 angle with a .032 skin for a total of .157. If the countersink is at least .032, then the grip length will be correct. This is the same technique as described in the plans to use a countersink in the wing attach angle doublers on the aft spar tunnel web to allow for CCC-44s to be used in lieu of CCC-46s. Does anyone see a problem with using CCP-42s on the 3 end rivets on top of the spar tunnel?
Direct C51
 
Posts: 178
Joined: Wed Jul 09, 2014 8:32 pm


Return to Sonex Plans

Who is online

Users browsing this forum: No registered users and 6 guests