When to rivet the fwd fuselage floor?
Posted: Tue Apr 01, 2014 9:42 am
I'm currently on plans page WIX-F11 (fuselage box assembly), I'm not sure what the equivalent Sonex page is, but it's where the fuselage side panels and floor are first attached, and riveted, to the aft fuselage.
If I follow the plans exactly, upon completion of this page I'll have the fwd fuselage floor riveted in place, and the fwd and aft fuselages riveted together at the sides. I'd really prefer to do neither of these things at this time. Any comments/concerns for leaving the floor either clecoed and/or off while moving forward up the building tree? Obviously there are many more details on the floor of the fwd fuselage (rear spar carry through, seat belt attach points, seat, etc), but will clecoes in the floor suffice until most everything is done?
If I follow the plans exactly, upon completion of this page I'll have the fwd fuselage floor riveted in place, and the fwd and aft fuselages riveted together at the sides. I'd really prefer to do neither of these things at this time. Any comments/concerns for leaving the floor either clecoed and/or off while moving forward up the building tree? Obviously there are many more details on the floor of the fwd fuselage (rear spar carry through, seat belt attach points, seat, etc), but will clecoes in the floor suffice until most everything is done?